Project name: Xing'an League Hospital solar energy system equipment procurement and installation project
Project type: hot water project case
Project time: 2014-07-03 to 2015-08-20
Project area: 1348 ㎡
The system form is centralized collector centralized heat storage, flat plate type hot water project
90 tons/1348 square meters
Realize long distance 170 meters heat transfer, using high temperature antifreeze, can withstand high temperature 300 ℃, solve the problem of high temperature oxidation of antifreeze, double heat exchange system, heat collection and heat exchange, water supply heat exchange, water supply without pressure boosting.
Xing'an League People's Hospital, located in Xing'an League, Hohhot City, Inner Mongolia Autonomous Region, designed in February 2013, the project time is from August 2014 to April 2015, the building type is public building, the total construction area is 150,000 square meters, the highest of the main building is 96 meters, is a national class building, the daily demand for hot water is 90 tons, the total heat collection area is 1348 square meters
Post time: Nov-18-2022